Housing Expertise Matrix · 6 pillars · AFAD / TBDY 2018 · blockchain tokenomics · value-capture fund
85-criteria blockchain, net-zero & seismic financing matrix
Every criterion is auto-scored 1–5 from expert inputs and weighed equally inside its pillar (AFAD seismic 20 % · net-zero 20 % · blockchain tokenomics 20 % · municipal value-capture fund 15 % · social justice 15 % · TCO & spatial equity 10 %). The composite index maps to TIER 1–4; the AFAD pillar prices the renewal bond, sizes the Değer Artış Payı fund share and mints carbon credits; a 7-code earthquake performance benchmark (TR 1998 / 2007 / 2018 / 2027 draft · USA · Japan · Chile) compares retrofit against reconstruction (SIMULATED ledger).
Linked to renewal case QA NoScan 2452 (Antakya, Hatay) — saving writes the matrix summary onto the case.
Project appraisal metadata · Executive Summary header
Building context · location-dependent acceleration
City presets are approximate DD-2 values at provincial centres — read SS / S1 for the parcel from tdth.afad.gov.tr and type them into pillar 1. ★ = critical criterion (a failing one caps the AFAD resilience class). Every criterion is auto-scored 1–5 from your inputs; criteria weigh equally inside a pillar.
Token offering terms · investor term sheet
Offering size = renewal bond principal of the preferred intervention; coupon = class-priced bond coupon; collateral coverage = post-intervention risk-adjusted value / principal.
Composite ecosystem feasibility index
AFAD / TBDY resilience class
Design acceleration
85 criteria · mean score
Pillar scorecard · Executive Summary
| Pillar | Weight | Avg 1–5 | Weighted % | Rating |
|---|---|---|---|---|
| AFAD Seismic Engineering & Structural Safety Standards | 20 % | 4.67 | 18.67 | EXCELLENT |
| Net-Zero Carbon Vision & Energy Transition | 20 % | 2.8 | 11.2 | MODERATE |
| Blockchain Ecosystem & Smart Contract Tokenomics | 20 % | 4.53 | 18.13 | EXCELLENT |
| Municipal Value-Added Capture Fund & Public Finance | 15 % | 4.14 | 12.43 | GOOD |
| Social Justice, Tenure Security & Anti-Displacement | 15 % | 4.6 | 13.8 | EXCELLENT |
| Total Cost of Ownership (TCO) & Urban Spatial Equity | 10 % | 3.82 | 7.64 | GOOD |
| TOTAL · Composite Ecosystem Feasibility & Investment Index | 100 % | 4.11 | 81.9 | TIER 2: VIABLE FINANCING MODEL |
Location-dependent seismic parameters · AFAD TDTH · TBDY 2018
DTS 2 → high ductility system mandatory above BYS 3
TBDY 2018 Table 2.1/2.2 site coefficients · SDS = SS·FS · SD1 = S1·F1 · PGA ≈ 0.4·SDS · DTS Table 3.2 · BYS Table 3.3. SS/S1 must be read from AFAD TDTH for the parcel.
Pillar sensitivity · which five inputs move the index or TIER most
Sensitivity analysis, not a guaranteed outcome: each row changes one input to an assumed best value and re-scores the matrix. Real projects change several inputs at once, at a cost, and gains are not additive.
Baseline 81.9 % · TIER 2 → if every improvable input reached its best value: 97.7 % · TIER 1 · class A (35 inputs can still improve)
| Input | Baseline | Assumed improvement | Resulting change |
|---|---|---|---|
1.C22Whole-life carbon assessment done documentation / certification | no score 1 / 5 · index 81.9 % · TIER 2 · class A | yes assumed: score → 5 / 5 (best achievable value) | +1 pt → 82.9 % TIER 2 unchanged |
2.C25Green roof / permeable surfaces design & equipment | no score 1 / 5 · index 81.9 % · TIER 2 · class A | yes assumed: score → 5 / 5 (best achievable value) | +1 pt → 82.9 % TIER 2 unchanged |
3.C26EU Taxonomy aligned (NZEB −10 %, DNSH) documentation / certification | no score 1 / 5 · index 81.9 % · TIER 2 · class A | yes assumed: score → 5 / 5 (best achievable value) | +1 pt → 82.9 % TIER 2 unchanged |
4.C28Battery / thermal storage & grid-flexibility ready design & equipment | no score 1 / 5 · index 81.9 % · TIER 2 · class A | yes assumed: score → 5 / 5 (best achievable value) | +1 pt → 82.9 % TIER 2 unchanged |
5.C59Independent / Sayıştay audit of the fund published documentation / certification | no score 1 / 5 · index 81.9 % · TIER 2 · class A | yes assumed: score → 5 / 5 (best achievable value) | +0.8 pt → 82.7 % TIER 2 unchanged |
Site constraints not improvable by the project: C57 Municipal credit standing · C82 Public green space per capita · C84 Walkability & street safety
Each input is set to its best achievable value one at a time and the matrix is re-scored; gain = new composite index − current. Practical ranking divides the gain by an effort factor (documentation 1 · governance 1.5 · design 2.5 · structural 5). Site constraints (soil, fault distance, SS, flood zone, transit, municipal rating, original design code) cannot be improved by the project and are excluded. Gains are not additive — the ceiling re-scores all improvable inputs together.
Earthquake performance analysis · 7-code benchmark
T₁ 0.437 s · capacity Cs ≈ 0.374 W · drift 0.007 · 7 / 7 compliant · strictest Japan BSL 1981 (Shin-Taishin) · 2000 revision| Code | Required Cs | Capacity ratio | Drift limit | Min concrete | Detailing | Regularity | Score | Verdict |
|---|---|---|---|---|---|---|---|---|
ABYYHY 1998 Türkiye · superseded (in force 1998–2007) | 0.0665 | 5.62× | 0.02 ✓ | C20 ✓ | ✓ | ✓ | 100 | compliant |
DBYBHY 2007 Türkiye · superseded (in force 2007–2018) · Ch. 7 existing-building performance (MN/GV/GÇ) | 0.0665 | 5.62× | 0.02 ✓ | C20 ✓ | ✓ | ✓ | 100 | compliant |
TBDY 2018 Türkiye · in force since 1 Jan 2019 (Resmî Gazete 18.03.2018) | 0.0588 | 6.36× | 0.008 ✓ | C25 ✓ | ✓ | ✓ | 100 | compliant |
TBDY 2027 (draft) Türkiye · DRAFT — not in force; provisions ASSUMED from the 2025 draft tebliğ notes (İMO/İTÜ) and post-2023 lessons | 0.0647 | 5.78× | 0.008 ✓ | C30 ✓ | ✓ | ✓ | 100 | compliant |
ASCE 7-22 · ACI 318-19 · ASCE 41-23 United States · in force (IBC 2024 adoption) · ASCE 41-23 for existing buildings (BPOE: LS @ BSE-1E, CP @ BSE-2E) | 0.0588 | 6.36× | 0.02 ✓ | C25 ✓ | ✓ | ✓ | 100 | compliant |
Japan BSL 1981 (Shin-Taishin) · 2000 revision Japan · in force · Seismic Retrofitting Promotion Law 1995 (Is ≥ Iso for existing buildings) | 0.315 | 1.19× | 0.01 ✓ | C20 ✓ | ✓ | ✓ | 100 | compliant |
Chile NCh433 Of.1996 Mod.2009 · DS61 / DS60 (2011) Chile · in force · post-Maule 2010 decrees DS61 (soil / spectrum) and DS60 (RC wall detailing) | 0.0735 | 5.09× | 0.014 ✓ | C20 ✓ | ✓ | ✓ | 100 | compliant |
TBDY 2018 — AFAD TDTH parcel SS/S1 → SDS 0.520 g · SD1 0.180 g · DTS 2 · site ZC
Reduction: R = 7 · D = 2.5 · Ra(T) = 7.00 · elastic Sa(T₁) 0.412 g · drift basis: δi/hi ≤ 0.008·κ (κ = 1 RC, 0.5 steel) with rigid infills; 0.016·κ with flexible / isolated infills (§4.9.1.3)
- Parcel-specific hazard (DD-1/2/3/4), ZA–ZF site classes, DTS/BYS system limits, performance-based design for tall / BKS 1 buildings
- Ch. 15 existing-building assessment (SH/KH/GÖ) feeds Law 6306 riskli yapı decisions
Code comparison · required base shear vs. drift limits
bars coloured by this building's verdict · compliant · marginal · deficient · dashed = this building · * draft, assumedRequired design base-shear coefficient Cs (fraction of W)
Comparable effective inter-storey drift limit
Retrofit vs reconstruction · cost & added value
retrofit · retrofit = 11.6 % of rebuild costbuilding already meets TBDY 2018; light strengthening keeps value and avoids displacement
| Metric | Strengthen · CFRP wrapping of columns/joints | Demolish & rebuild to TBDY 2018 (high ductility, ≥ C30) |
|---|---|---|
| Total cost | 11,150,400 TRY | 95,796,000 TRY |
| · of which housing aid | 230,400 TRY | 9,216,000 TRY |
| Months of works | 3 | 24 |
| Risk-adjusted value before | 175,779,000 TRY | 175,779,000 TRY |
| Value after | 177,256,350 TRY | 237,600,000 TRY |
| Added value | 1,477,350 TRY | 61,821,000 TRY |
| Net benefit (value − cost) | -9,673,050 TRY | -33,975,000 TRY |
| Benefit / cost | 0.13 | 0.65 |
| Residual life | 40 yr | 50 yr |
| Embodied carbon | 112 tCO₂e | 1520 tCO₂e |
| Codes compliant after | 7 / 7 | 7 / 7 |
| TBDY 2018 after | compliant | compliant |
| Collateral coverage (value / bond) | 19.87 × | 4.05 × |
| LTV after | 5 % | 24.7 % |
Value before = as-is × (1 − 0.35 × (1 − AFAD attainment)); retrofit value lifts attainment by the scheme's risk reduction; rebuild value = as-is × (1 + plan uplift) × (1 + 10% new-build premium). Costs include Law 6306-style rent aid 12,000 TRY/unit/month × months × occupancy loss (rebuild 24 months). Scheme catalogue from the 6D-7D retrofit module; SIMULATED economics.
Capacity Cs ≈ code-era base × system × concrete × (1 − corrosion) × irregularity × detailing factors (SIMULATED proxy; replace with pushover / NLTHA from the Seismic Analysis Lab). Each code's required Cs, drift limit and prescriptive rules are emulated from the published provisions at the building's period T1 = Ct·H^0.75; compliance score = 40 strength + 30 drift + 10 concrete + 10 detailing + 10 regularity. TBDY 2027 values are assumptions on an unpublished draft.
Earthquake-safe construction cost & bond
Değer Artış Payı · local value-added fund
Law 3194 Ek Md. 8 (as amended 2024/2025): 90 % of the plan-change value increase; metropolitan provinces 25 % metropolitan / 25 % district / 25 % Ministry Dönüşüm Projeleri Özel Hesabı / 25 % general budget; others 40 % approving administration / 30 % Ministry account / 30 % general budget.
Carbon-zero credits & funding stack
Composite index = Σ pillar weight × (mean 1–5 score / 5) → TIER 1 ≥ 85 % · TIER 2 ≥ 70 % · TIER 3 ≥ 55 % · TIER 4; resilience class E forces TIER 4 (not financeable) and class D caps the tier at 3. Resilience class = pillar 1 (AFAD) attainment (A ≥ 85 · B ≥ 70 · C ≥ 55 · D ≥ 40 · E); any failing critical criterion caps the class at C, three or more at D; riskli yapı, C16 concrete or pre-1975 design force E. Advisory expert screening, not a legal risk determination under Law 6306. Deterministic rubric over the expert inputs — not a structural analysis. Use the Seismic Analysis Lab / linked hyperspectral scan for measured values and have a licensed engineer confirm AFAD/TBDY compliance. Cost = base unit cost × city factor × (1 + seismic + carbon uplift) × (1 − collective savings). Seismic uplift: DTS 1/2/3/4 → 12/8/4/0 %, base isolation +10 %, dampers +6 %, ZD/ZE/ZF foundations +6/8/12 %, high ductility +3 %. Collective imece savings 35 % (no developer margin 15 + imece labour 12 + procurement 8). Bond coupon = base rate + class premium (A −1.5 · B −0.75 · C 0 · D +2.0 · E not financeable) − 0.5 green. All amounts TRY, SIMULATED ledger.